This presentation has the objective to show examples of Cost Containment of Aerospace Construction at Kennedy Space Center (KSC), taking into account four major levels of Project Development of the Space Shuttle Facilities. The levels are related to conceptual criteria and site selection, the design of construction and ground support equipment, the construction of facilities and ground support equipment (GSE), and operation and maintenance. Examples of cost containment are discussed. The continued reduction of processing time from landing to launching represents a demonstration of the success of the cost containment methods. Attention is given to the factors which led to the selection of KSC, the use of Cost Engineering, the employment of the Construction Management Concept, and the use of Computer Aided Design/Drafting.
Cost containment and KSC Shuttle facilities or cost containment and aerospace construction
1985-01-01
Conference paper
No indication
English
British Library Conference Proceedings | 1992
Rail Car Cost Containment Study
NTIS | 1990
Rail Car Cost Containment Study
NTIS | 1988
|METRA Rail Car Cost Containment Study
NTIS | 1991