The Space Shuttle Main Engine (SSME) represents the beginning of reusable rocket engine operations in the space transportation system (STS). Steps taken to reduce the overall cost of flight operations of the SSME by improving turnaround operations, extending the life of the engine, and improving the cost effectiveness of overhaul operations at the Canoga Park home plant are described. Ground certification testing to ensure safe launch operations is described, as well as certification extension testing that leads to a service life equivalent to 40 flights. The proven flight record of the SSME, which has demonstrated the utility of the SSME as a key component of America's space transportation system, is discussed.
Cost effective launch operations of the SSME
1985-01-01
Conference paper
No indication
English
NTRS | 1983
|SSME Key Operations Demonstration
NTIS | 1997
|SSME evolution for next generation launch systems
AIAA | 1989
|SSME Key Operations Demonstration
NTRS | 1997
|SSME key operations demonstration
AIAA | 1997
|