The static firing of the Space Shuttle Main Engine in preparation for the launch of the Enterprise Orbiter is discussed. The following were also tested: structures and mechanics; thermal design integration; propulsion and power; avionics and software; guidance, navigation, and control; mechanical systems; communications and tracking; and integrated ground systems.
Space shuttle flight readiness firing dress rehearsal for STS-1
1985-01-01
Conference paper
No indication
English
Space technology - Atlas V launch dress rehearsal
Online Contents | 2002
Atlas SOHO Wet Dress Rehearsal
NTRS | 1995
Biosafe Dress Rehearsal for Mars Sample Containment Using In-Space Sterilization
SAE Technical Papers | 2003
|The data systems test-dress rehearsal for FGGE
NTRS | 1977
|