Requirements for refurbishing the LANDSAT-D spacecraft after its recovery from orbit at the end of a 3-year mission in order to reuse the spacecraft on a second 3-year mission were studied. A schedule of the time required for the refurbishment including the procurement cycle for long lead-time items is developed. The costs of refurbishing and of procuring an entirely new LANDSAT-D spacecraft are compared.