Project logic, schedule and funding information was derived to enable decisions to be made regarding implementation of MEC system development. A master schedule and cost and price estimates (ROM) were developed for a project that consists of development of an all-up MEC, its integration with payloads and its flight on one 90 day mission. In Part 2 of the study a simple initial MEC was defined to accommodate three MPS baseline payloads. The design of this initial MEC is illustrated. The project logic, detailed schedules, and ROM cost estimate relate to a project in which this initial MEC is developed, integrated with payloads and flown once for 180 days.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Materials experiment carrier concepts definition study. Volume 3: Programmatics, part 2


    Publication date :

    1981-12-17


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English