To assure the functional integrity of the GLL-RPM fuel and pressurized gas tank, all activities during entire lifetime of the tank, from manufacture to the end of the mission, must be monitored. Specifications are given for all procedures which influence the tank structure including design, manufacture, cleaning, test operations, and storage. Tests to be conducted to demonstrate that requirements of the fracture control plan are satisfied include static tests, cyclic load tests, proof tests, He-leak test, and acceptance tests.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Fracture control plan for propellant and pressurant tanks


    Publication date :

    1981-02-01


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English