Cost effective techniques for addressing management and operational activities on Spacelab were identified and analyzed during a ten day NASA-ESA cooperative mission with payload and flight responsibilities handled by the organization assigned for early Spacelabs. Topics discussed include: (1) management concepts and interface relationships; (2) experiment selection; (3) hardware development; (4) payload integration and checkout; (5) selection and training of mission specialists and payload specialists; (6) mission control center/payload operations control center interactions with ground and flight problems; (7) real time interaction during flight between principal investigators and the mission specialist/payload specialist flight crew; and (8) retrieval of scientific data and its analysis.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    NASA/ESA CV-990 Spacelab Simulation (ASSESS 2)


    Publication date :

    1977-07-01


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English




    NASA/ESA CV-990 Spacelab Simulation (ASSESS 2)

    Mulholland, D. R. / Androes, G. M. / Reeves, J. F. | NTRS | 1978


    NASA/ESA Cv-990 Spacelab Simulation (ASSESS 2)

    D. R. Mulholland / G. M. Androes / J. F. Reeves | NTIS | 1978