The verification process and requirements for the ascent guidance interfaces and the ascent integrated guidance, navigation and control system for the space shuttle orbiter are defined as well as portions of supporting systems which directly interface with the system. The ascent phase of verification covers the normal and ATO ascent through the final OMS-2 circularization burn (all of OPS-1), the AOA ascent through the OMS-1 burn, and the RTLS ascent through ET separation (all of MM 601). In addition, OPS translation verification is defined. Verification trees and roadmaps are given.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Integrated guidance, navigation and control verification plan primary flight system


    Publication date :

    1978-05-01


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English





    Integrated Flight Path Planning System and Flight Control System for Navigation and Guidance of Unmanned Helicopter

    Lin, Y.-H. / Institute of Navigation | British Library Conference Proceedings | 2009


    Autonomous guidance, navigation and control bridging program plan

    Mcswain, G. G. / Fernandes, S. T. / Doane, K. B. | NTRS | 1991


    Integrated Nonlinear Guidance/Flight Control

    Chang, C. F. / Lin, Y. Y. | British Library Conference Proceedings | 1993


    Integrated navigation, flight guidance, and synthetic vision system for low-level flight [4023-11]

    Mehler, F. E. / International Society for Optical Engineering | British Library Conference Proceedings | 2000