The LANDSAT operations from launch through orbital instrument observations are reviewed. Orbital parameters, power subsystem, attitude control subsystem, and command/clock subsystem are discussed. Other subsystems are also considered, such as telemetry, orbit adjust, electrical interface, thermal, wideband telemetry, multispectral scanner, and data collection.
LANDSAT-1 and LANDSAT-2 flight evaluation report, 23 January - 23 April 1977
1977-05-23
Report
No indication
English