The payloads tentatively planned to fly on the first two Spacelab missions were analyzed to examine the cost relationships of providing mission operations support from onboard vs the ground-based Payload Operations Control Center (POCC). The quantitative results indicate that use of a POCC, with data processing capability, to support real-time mission operations is the most cost effective case.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Integrated payload and mission planning, phase 3. Volume 3: Ground real-time mission operations


    Contributors:

    Publication date :

    1977-03-31


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English