A progress report is given on various systems, noting conformity to schedule or changes in design. The Orbiter thermal protection system, the Space Shuttle main engine, the intertank for the structural test article (STA), thrust vector control systems, the Kennedy Space Center launch processing system, and Orbiters No. 1 and No. 2 are discussed.
Space Shuttle 1976 into mainstream development - Program commitments on schedule to insure careful progress