The use of the Saturn Uranus telemetry design for Jupiter entry requires the following qualifications in space probe data handling: A single dump substitute for the dual damp, a reduction in the neutral mass spectrometer rate, and providing that a second burn is made, a delta V correction.
Communications constraints on a Jupiter probe mission
1974-08-01
Conference paper
No indication
English