A systems and operational summary of the Titan 3E/Centaur D-1T program is presented which describes vehicle assembly facilities, launch facilities, and management responsibilities, and also provides detailed information on the following separate systems: (1) mechanical systems, including structural components, insulation, propulsion units, reaction control, thrust vector control, hydraulic systems, and pneumatic equipment; (2) astrionics systems, such as instrumentation and telemetry, navigation and guidance, C-Band tracking system, and range safety command system; (3) digital computer unit software; (4) flight control systems; (5) electrical/electronic systems; and (6) ground support equipment, including checkout equipment.
Titan 3E/Centaur D-1T Systems Summary
1973-09-01
Report
No indication
English
Titan 3E/Centaur D-1T Systems Summary
NTIS | 1973
Titan IVB, SRMU and Centaur propulsion systems
AIAA | 1998
|Titan 4-Centaur orbits classified payload
Online Contents | 1994
Titan/Centaur - NASA's newest launch vehicle
AIAA | 1973
|FIRST TITAN IV-CENTAUR LAUNCH PUTS MILSTAR INTO ORBIT
Online Contents | 1994
|