An executive summary is presented of a Spacelab concept study conducted from August 1973 to June 1974. Background information and a summary of study conclusions are given. Specific data are reported for the quick-reaction carrier concept, software and mission integration, configuration management, documentation, equipment pool, and integration alternatives. A forecast of the impact of a second launch site, mission feasibility, and space availability for the Spacelab are also discussed.
Operational concepts for selected Sortie missions: Executive summary
1974-06-01
Report
No indication
English
Analysis of extended-duration sortie missions
NTRS | 1975
|Sortie-Class Human Missions to Mars
NTRS | 2018
|Operational Strategies and Critical Capabilities for Human Sortie Missions on the Lunar Surface
British Library Conference Proceedings | 2006
|Operational Strategies and Critical Capabilities for Human Sortie Missions on the Lunar Surface
British Library Conference Proceedings | 2006
|