The contractor tasks required to produce a shuttle mission simulator for training crew members and ground personnel are discussed. The tasks will consist of the design, development, production, installation, checkout, and field support of a simulator with two separate crew stations. The tasks include the following: (1) review of spacecraft changes and incorporation of appropriate changes in simulator hardware and software design, and (2) the generation of documentation of design, configuration management, and training used by maintenance and instructor personnel after acceptance for each of the crew stations.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Shuttle mission simulator requirements report, volume 1, revision C


    Contributors:

    Publication date :

    1973-12-21


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English