Research equipment requirements were based on the Mini-7 and Mini-30 laboratory concepts defined in Tasks A and B of the intial LSPD contract. Modified versions of these laboratories and the research equipment within them were to be used in three missions of Shuttle/Sortie Module. These were designated (1) the shared 7-day laboratory (a mission with the life sciences laboratory sharing the sortie module with another scientific laboratory), (2) the dedicated 7-day laboratory (full use of the sortie module), and (3) the dedicated 30-day laboratory (full sortie module use with a 30-day mission duration). In defining the research equipment requirements of these laboratories, the equipment was grouped according to its function, and equipment unit data packages were prepared.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Life science payload definition and integration study, task C and D. Volume 3: Appendices


    Publication date :

    1973-08-01


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English


    Keywords :