The computerized mission control and planning system routinely generates a 24-hour schedule in one hour of operator time by including time dimensions into experimental planning procedures. Planning is validated interactively as it is being generated segment by segment in the frame of specific event times. The planner simply points a light pen at the time mark of interest on the time line for entering specific event times into the schedule.
Interactive experimenters' planning procedures and mission control
1973-01-01
Conference paper
No indication
English
The satellite experimenters handbook
Tema Archive | 1984
|Engineering Managers as Experimenters
SAE Technical Papers | 1974
|Conference of tank experimenters
Engineering Index Backfile | 1951
Solar and Heliospheric Observatory (SOHO) Experimenters' Operations Facility (EOF)
British Library Conference Proceedings | 1994
|