The results of the analysis conducted on the telemetry data from the prelaunch, launch, and flight activation phases of the ERTS-1 spacecraft are presented. It is presented by sub system sections and provides for inter-relationships as they exist between the several subsystems. A brief statement of subsystem characteristics precedes flight evaluation statements. The appendix contains a total list of components flow on ERTS-1 and a complete listing of commands and telemetry functions for reference.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    ERTS 1 launch and flight activation evaluation report, 23 - 26 July 1972. Launch through Orbit 35 and orbit adjust operation


    Publication date :

    1972-10-18


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English


    Keywords :