The findings and data products developed during the Phase 2 crew interface specification study are presented. Five new NASA general specifications were prepared: operations location coding system for crew interfaces; loose equipment and stowage management requirements; loose equipment and stowage data base information requirements; spacecraft loose equipment stowage drawing requirements; and inflight stowage management data requirements. Additional data was developed defining inflight maintenance processes and related data concepts for inflight troubleshooting, remove/repair/replace and scheduled maintenance activities. The process of maintenance task and equipment definition during spacecraft design and development was also defined and related data concepts were identified for futher development into formal NASA specifications during future follow-on study phases of the contract.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Crew interface specifications preparation for in-flight maintenance and stowage functions


    Contributors:

    Publication date :

    1972-11-09


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English


    Keywords :