Detailed review of component failure histories, qualification adequacy, manufacturing flow, checkout requirements and flow, ground support equipment interfaces, subsystem interface verification, protective devices, and component design did not reveal major weaknesses in the command service module (CSM) reaction control system (RCS). No changes to the CSM RCS were recommended. The assessment reaffirmed the adequacy of the CSM RCS for future Apollo missions.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Command module/service module reaction control subsystem assessment


    Contributors:

    Publication date :

    1971-06-01


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English


    Keywords :