A summary of S-2 Program problems and the solutions that were implemented is presented. The problems occurred during a period starting with the initial design concepts and continuing through the launch of the tenth S-2 flight stage information is from nine separate disciplines: design, facilities, logistics, manufacturing, material, program management, quality assurance, safety, and tests.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Saturn S-2 problem resolution history report


    Contributors:

    Publication date :

    1971-09-01


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English


    Keywords :



    Saturn Report

    NTRS | 1959


    Saturn 1 status report

    Lindstrom, R. E. | NTRS | 1964



    High-spectral-resolution imagery of Saturn

    Smith, W. H. / Mccord, T. B. / Macy, W. | NTRS | 1981