Design, fabrication, and testing of the Mariner Mars 1971 pyrotechnic subsystem are reviewed. Emphasis is placed on those changes from the Mariner Mars 1969 configuration. Major problems occurring in the developmental and testing phases are discussed.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Development and testing of the pyrotechnic subsystem to the Mariner Mars 1971 spacecraft


    Contributors:
    Alexander, P. (author) / Earnest, J. (author) / Murphy, A. (author) / Quinn, J. (author)

    Publication date :

    1971-12-15


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English