The basic telemetry-system concept for Explorer XI11 was selected primarily on the basis of demonstrated performance (ref. IV-1). The successful orbiting of Vanguard I1 (1939 Alpha) and Vanguard I11 (1959 Eta) had proven the basic design of the tracking and telemetry concepts which were compatible with mini- track network. It was necessary for the NASA Langley Research Center (LRC) to expand the system to provide a 48-channel telemetry system. Two of these sys- tems were used in the Explorer XI11 in order to provide the required channel capacity.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Telemetry design


    Contributors:

    Publication date :

    1964-11-01


    Type of media :

    Article/Chapter (Book)


    Type of material :

    No indication


    Language :

    English




    Telemetry installation design

    Wynn, Jr., J.B. / Ackerman, S.L. | Engineering Index Backfile | 1952


    Telemetry

    Boyadzhyan, V. V. | NTRS | 1998


    Nimbus Telemetry

    Adkins, F. L. / Griffin, C. E. | NTRS | 1962


    Apollo PCM telemetry -- Design and evolution

    Caudill, C. | Engineering Index Backfile | 1967


    Telemetry system design for Saturn vehicles.

    Frost, W. O. / Norvell, D. E. | NTRS | 1966