The crash analysis of the I-440 bridge over Crabtree Creek did not reveal any previous incidents such as the triggering event. During the five year study period, there were a total of 28 collisions that resulted in no fatalities and six injuries. Specifications and guidelines for bridge rail type were also examined for this location. Since pedestrians and bicyclists are prohibited from full control of access facilities such as I-440, the existing bridge rail meets current specifications and guidelines. For reference, excerpts from the North Carolina Department of Transportation. The results of this analysis have been forwarded to the Regional Traffic Engineers office for further review as deemed necessary by that office.
Parallel Bridges: An Analysis of Potential Safety Issues Involving Parallel Bridges. Final Report
2010
295 pages
Report
No indication
English
Stability of Liquid Bridges Between Parallel Plates
British Library Online Contents | 1992
|Application of adhesives to steel bridges : final report
TIBKAT | 1984
|British Library Conference Proceedings | 2008
|Road crashes involving bridges and culverts
SLUB | 1997
|Issues in Rating Steel-Stringer Bridges
Online Contents | 1995
|