The activities and results of the test and operations program performed on the three orbiter spacecraft (VO-1, VO-2, and VO-3) are described. The period from receipt of orbiter hardware at the Spacecraft Assembly Facility at JPL through shipment of the orbiter systems and support equipment to the Air Force Eastern Test Range is covered.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Viking 75 Orbiter System Test and Launch Operations. Volume 1: System Test


    Publication date :

    1977


    Size :

    89 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English