These presentation slides review the progress in the development of the Ares I upper stage. The development includes development of a manufacturing and processing assembly that will reduce the time required over 100 days, development of a weld tool that is a robotic tool that is the largest welder of its kind in the United States, development of avionics and software, and development of logisitics and operations systems.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Ares I Upper Stage Update


    Contributors:
    D. J. Davis (author)

    Publication date :

    2010


    Size :

    16 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English




    Ares I Upper Stage Element

    Chojnacki, Kent | NTRS | 2009


    Ares I Upper Stage Overview

    Verhage, Marc | NTRS | 2007




    ARES I Upper Stage Subsystems Design and Development

    Frate, David T. / Senick, Paul F. / Tolbert, Carol M. | NTRS | 2011