Variables used in Volume I, Study Results, which are of the type heavily influenced by management philosophy, available resources, etc., are investigated for their effect on problem identification test costs. Cost optimizations of bench test versus flight test were performed at 126 data points. In particular, the variables studied are: MTBR off-the-board, corrective action efficiency, test effectiveness, and test operating time/calendar time, MTBR off-the-board and corrective action efficiency are identified as the variables which can heavily influence the problem identification test costs. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Helicopter Development Reliability Test Requirements. Volume III. Sensitivity analysis


    Contributors:
    R. H. Jines (author)

    Publication date :

    1972


    Size :

    79 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English