The report describes progress on the Engineering and Test Support Services for Railroad Instrumentation, Data Acquisition, Processing and Evaluation Program from 1 July 1978 through 30 June 1979. This report covers operation and maintenance of the FRA track-geometry-measurement and data acquisition fleet. It also covers track survey operations and dynamic tests on lightweight flatcars, Rohr Turboliners, Amcoach brakes, Metroliners, perturbed track testing of locomotives, track stiffness, DODX railcars and LRC cant deficiency. A description of the Wayside Detection Facility is included as well as descriptions of various improvements to the survey cars and their measurement equipment.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Test Train Program Eleventh Annual Report


    Publication date :

    1981


    Size :

    148 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English





    Eleventh annual report

    Engineering Index Backfile | 1925



    Test Train Program Sixth Progress Report

    C. Peterson / W. Kaufman / T. L . Yang et al. | NTIS | 1974