This is a follow-up project to perform field operational tests of a conservation traffic control load switch developed in an earlier IDEA project (NCHRP-IDEA project 8). The current project developed a manual for installation and operation of the conservation traffic control load switch. About 100 switch units were assembled and provided to state highway agencies and municipalities for evaluation. Based on the feedback received from the highway agencies, the switch housing design was modified. The specifications and NEMA certification of conformance for the switch system were completed.
Operational Tests of the Conservation Traffic Control Load Switch
1996
22 pages
Report
No indication
English
Online Contents | 1995
Operational Errors in Air Traffic Control Towers
Online Contents | 2002
|Validation Tests of Fiber Optic Strain-Based Operational Shape and Load Measurements
British Library Conference Proceedings | 2012
|Operational Real-Time Urban Traffic Control System
British Library Conference Proceedings | 1997
|