Presented are the planning, procedures, and results of the first complete pumpdown and leak check of the Aerospace Environmental Chamber (Mark I). The objective of the pumpdown and leak check was to reduce the total leakage of the 106,000-cu ft. vacuum chamber to the low 0.001 std cc/sec range. The total leakage was reduced from 5000 std cc/sec to 0.002 std cc/sec in 26 normal work days, 50 hr of which was devoted to chamber operational leak detection. The procedures and techniques of vacuum system analysis and leak detection used in this operation are described, as are the modifications and additions to the chamber which were required to accomplish the project objective. The results of the operation proved the adequacy of the techniques used, and demonstrated the capability of reducing chamber leakage to much less than 0.002 std cc/sec.
Initial Pumpdown and Leak Check of the Aerospace Environmental Chamber (Mark I)
1966
41 pages
Report
No indication
English
Laboratory & Test Facility Design & Operation , Fluid Mechanics , Space simulation chambers , Leakage(Fluid) , Vacuum apparatus , Leak detectors , Diffusion pumps , Cryopumping , Vacuum pumps , O rings , Seals , Environmental tests , Theory , Pressure , Gas analysis , Mass spectroscopy , Test facilities
Pumpdown (TFL) technology for subsea completions II
Tema Archive | 1978
|Aerospace leak test requirements
AIAA | 2000
|Aerospace Leak Test Requirements
British Library Conference Proceedings | 2000
|Aerospace Payloads Leak Test Methodology
NTRS | 2010
|