Topics discussed include: (1) design considerations for a MARS sample return laboratory module for space station investigations; (2) crew productivity as a function of work shift arrangement; (3) preliminary analysis of the local logistics problem on the space construction base; (4) mission hardware construction operational flows and timelines; (5) orbit transfer vehicle concept definition; (6) summary of results and findings of space processing working review; (7) crew and habitability subsystem (option L); (8) habitability subsystem considerations for shuttle tended option L; (9) orbiter utilization in manned sortie missions; (10) considerations in definition of space construction base standard module configuration (option L); (11) guidance, control, and navigation subsystems; and (12) system and design tradeoffs.
Space Station Systems Analysis Study. Part 2, Volume 3: Appendixes, Book 2: Supporting Data (7 Through 18)
1977
444 pages
Report
No indication
English
Astronautics , Spacecraft Trajectories & Flight Mechanics , Manned Spacecraft , Space stations , Spacecraft modules , Aerospace engineering , Cost effectiveness , Systems analysis , Life support systems , Nasa programs , Satellite orbits , Space erectable structures , Space manufacturing , Space shuttles