The subjects of the 9 reports are as follows: (1) LNG Regasification Plant North Sea Island; Temporary Points of Departure Gasunion. (2) Environmental Effects of an LNG Terminal. (3) LNG Arrival Maas Area Versus Gas Island. (4) Risk limiting measures arrival LNG, cost aspect. (5) Risk analysis LNG alternative arrival of oil and oil derivatives. (6) Safety and environmental aspects of import and use of fuels--comparison between LNG, oil and coal. (7) Risk reduction for LNG terminal located in Maas Area; efficiency and costs. (8) Consequences of a critical collision or grounding of a 330,000 cubic meters LNG tanker of the verolnave type. (9) Collision resistance of a very large LNG tanker.
Aanvoer, Overslag en Opslag van Vloeibaar Aardgas. Aanvullend Onderzoek in Opdracht van de Werkgroep Milieu en Veiligheid (Arrival, Transhipment and Storage of Liquified Natural Gas, Supplementary Study at Request of Working Group Environment and Safety)
1977
260 pages
Report
No indication
English
profiel - Werkgroep veiligheid middengeleiders
Online Contents | 1995
Sleutelrol taxi bij aanvullend vervoer
Online Contents | 1994
Nederlandse werkgroep hartstimulatie
British Library Conference Proceedings | 2003