This slide presentation reviews the efforts at analyzing the Crew Module (CM) for the Orion Project. The Integrated Thermal Model is described, and the on-orbit analysis for the 4 different mission phases is also described. The four mission phases are: Mission phase (1) Low Earth Orbit (LEO) International Space Station (ISS) mission (2) ISS docked (3) LEO, lunar mission and (4) Low Lunar Orbit (LLO).


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Orion Project Crew Module Analyses Summary


    Contributors:

    Publication date :

    2009


    Size :

    42 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English




    Orion Project Crew Module Analyses Summary

    Alvarez-Hernandez, Angel | NTRS | 2009


    Orion Crew Module Aerodynamic Testing

    K. J. Murphy / K. L. Bibb / G. J. Brauckmann et al. | NTIS | 2011


    Orion Crew Module Aerodynamic Testing

    Murphy, Kelly J. / Bibb, Karen L. / Brauckmann, Gregory J. et al. | NTRS | 2011


    Orion Crew Module Aerodynamic Testing

    Murphy, K. / Bibb, K. / Brauckmann, G. et al. | British Library Conference Proceedings | 2011


    Orion Crew Module Aerodynamic Testing

    Murphy, Kelly / Brauckmann, Greg / Bell, James et al. | AIAA | 2011