The project proposes the construction for a new dam and spillway located close to the existing Melones Dam. Access roads, resident engineer facilities, downstream public overlook and safety scaling of the damsite have been completed. Additional project related work will include road and utility relocations, powerhouse, switchyard, surge tank, reservoir clearing and initial recreation facility construction. A number of caves and archeological sites will be inundated. (Author)
New Melones Lake, Stanislaus River, California
1972
120 pages
Report
No indication
English
Fixed-Cone Valve Prototype Tests, New Melones Dam, California
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1983
|Fixed-Cone Valves, New Melones Dam, California: Hydraulic Model Investigation
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1981
|HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1981
|