Facilities are described on which detailed preliminary design was undertaken and which may be used on early space shuttle missions in the 1979-1982 time-frame. The major hardware components making up each facility are identified, and development schedules for the major hardware items and the payload buildup are included. Cost data for the facilities, and the assumptions and ground rules supporting these data are given along with a recommended listing of supporting research and technology needed to ensure confidence in the ability to achieve successful development of the equipment and technology.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Automated Space Processing Payloads Study. Volume 3: Equipment Development Resource Requirements


    Publication date :

    1975


    Size :

    30 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English