It is proposed to acquire land for airport development and clear zone easements (approximately 30 acres - fee title; 16 acres - easement); construct 3300' by 60' (NE-SW) paved asphaltic concrete runway; construct 170' x 400' paved asphaltic concrete aircraft parking apron; install medium intensity runway lights; install visual approach slope indicator (VASI), rotating beacon, segmented circle with 8' lighted wind cone; construct 1500' by 16' access road; construct barbed wire fence. The proposed project does not involve the displacement and relocation of persons residing on land needed for the development. No increases in the present low level of noise or air pollution are anticipated as the proposed improvements are to more safely and efficiently accommodate those types and numbers of general aviation aircraft currently using the airport.
Proposed Improvements, Ozark-Franklin County Airport, City of Ozark, Franklin County, Arkansas
1973
43 pages
Report
No indication
English
Engineering Index Backfile | 1942
|Spillway Vibration, Pressure and Velocity Measurements, Ozark Lock and Dam, Arkansas River, Arkansas
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1977
|Navigation Conditions at Ozark Lock and Dam, Arkansas River: Hydraulic Model Investigation
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1968
|