The proposed improvements include reconstructing and potentially relocating the North Sheridan Interchange, improvements to I-90 and improvements to North Main Street. The North Sheridan Interchange is the first interchanges serving the city of Sheridan, Wyoming for eastbound vehicles on I-90 and the last interchange for westbound vehicle son I-90. Three alternatives were analyzed in the Environmental Assessment - The No-Build, Reconstruct Interchange at the Existing Location (Alternative 2), and Interchange close to Decker Road 9Modified Alternative 4). WYDOT has identified Modified Alternative 4 as the Preferred Alternative due to cost, operations, fewer wetland impacts, and no commercial or residential relocations.
North Sheridan Interchange April 2012: Environmental Assessment
2012
113 pages
Report
No indication
English
Transportation , Highway Engineering , Civil Engineering , Road Transportation , Transportation & Traffic Planning , Highway improvement , Environmental Assessment (EA) , Interchanges(Highways) , Improvement functions , Highway capacity expansions , Safety improvement , Roadway conditions , Economic developement , North Sheridan Interchange , wyoming
Engineering Index Backfile | 1939
Engineering Index Backfile | 1939
Engineering Index Backfile | 1939
Engineering Index Backfile | 1939
Equitable interchange assessment with micro-simulation
British Library Conference Proceedings | 2005
|