The report describes the improvement of the existing two-lane, open ditch roadway to four lanes with flush median, curb and gutter at the outside pavement edges, and storm sewer. The alignment is along present US-50 in Emporia, beginning at Graphic Arts Road and extending 1.1 miles southeasterly to Prairie Street. The project will replace the present two-lane section, matching the existing four-lane roadways at each end of the project, providing improved service for traffic operation, no displacement of people or businesses, and bringing US-50 into compliance with the City's Master Plan.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    US-50 in Emporia, From Graphic Arts Road thence Southeasterly, 1.1 Miles to Prairie Street, Kansas


    Publication date :

    1972


    Size :

    31 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English