An LGM-30G Stage III Solid-propellant rocket motor, PQA-103, was fired in Rocket Development Test Cell (J-5), Engine Test Facility (ETF), in support of the Minuteman Stage III Production Quality Assurance Test Program. Motor ballistic, liquid-injection thrust vector control system, roll control system, and thrust termination system performance was within model specification requirements. Ignition of the roll control gas generator and the liquid-injection thrust vector control isolation squibs was accomplished, as programmed, 2.5 sec before motor ignition at a pressure altitude of 102,000 ft. The motor was ignited at a pressure altitude of 101,000 ft. Motor ignition delay time was 89 msec. Motor thrust termination occurred at 59.93 sec at a chamber pressure of 75.3 psia. During the 59.93-sec action time the motor produced an unaugmented vacuum total impulse of 2,083,103 lbf-sec. The unaugmented vacuum specific impusle was 284.96 lbf-sec/lbm. Maximum interstage pressure at thrust termination was within specificaton. Postfire motor structural integrity was satisfactory.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Production Quality Assurance Testing of A Thiokol Minuteman LGM-30G Stage III Rocket Motor at Simulated Pressure Altitude, Motor PQA-103


    Contributors:
    D. E. Franklin (author) / C. H. Kunz (author)

    Publication date :

    1973


    Size :

    62 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English