The proposal covers construction of a Stage 2 basic utility airport with one runway 3200 ft x 75 ft, taxiway, VASI, and associated developments. The Adverse impacts are exposure of a new area to minimal levels of air and sound pollution due to aircraft operations, and channel relocation.
Piedmont Municipal Airport, Piedmont, Missouri. Construction of a Stage II Basic Utility Airport with one Runway 3200 ft x 75 ft, Taxiway, VASI, and Associated Developments. ADAP Request
1972
33 pages
Report
No indication
English