The previous quarterly reports described the program, its goals, and the plans designed to meet these goals, as well as outlining the progress made in investigating problem areas and enumerating the items of hardware fabricated for exploring these problem areas. This report concentrates on presenting and evaluating the test data accumulated during Phase II Part II component testing as well as submitting process specifications for brazing permanent joints, for assembling detachable joints, and for bending tubing. (Author)
Hydraulic Plumbing for Advanced Aerospace Vehicles
1968
169 pages
Report
No indication
English
Industrial & Mechanical Engineering , Manned Spacecraft , Spacecraft , Hydraulic equipment , Pipes , Performance(Engineering) , Standards , Failure(Mechanics) , Disconnect fittings , Joints , Defects(Materials) , Vibration , Stresses , Pressurization , Titanium alloys , Thermal shock , Torque , Life expectancy , Bending , Elastic properties , Brazing , Titanium alloy 6al 4v , Tubing