This report describes the progress on the Engineering and Test Support Services for Railroad Instrumentation, Data Acquisition, Processing and Evaluation Program from 1 July 1977 through 30 June 1978. The report covers operation of the FRA track-geometry-measurement, data acquisition and rail-flaw-detection fleet, as well as track survey operations and the related data processing. The report also describes special tests on Lightweight Flatcar Evaluation, Full-Scale Aerodynamic Tests of Trailer-on-a-Flatcar, Piggyback Evaluation, Maintenance-of-Way, Passenger Vehicle Studies, Dynamic Locomotive Testing, and Track Stiffness Measurement System Evaluation. Fabrication and installation of the new Wayside Detection Facility at TTC is also described herein.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Test Train Program. Tenth Annual Report


    Publication date :

    1979


    Size :

    99 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English





    Tenth annual meeting

    Engineering Index Backfile | 1939



    1989 tenth annual engine roundup

    Automotive engineering | 1989


    Test Train Program Sixth Progress Report

    C. Peterson / W. Kaufman / T. L . Yang et al. | NTIS | 1974