The spaceborne testing equipment carried by the orbiter and the measuring equipment onboard the satellite (telemetry) is tested to verify that each is operating satisfactorily. The satellite command system is also checked. Thermal stabilization with the satellite in the orbiter shadow is achieved in six to eight hours. Satellite subsystem tests are run, and thermal control by heaters is checked. Thermal stabilization with the satellite exposed to the sun (when the orbiter is in sunlight) is again achieved in an estimated six to eight hours. Subsystem tests are again run in the hot condition, and heat rejection tests are made.
On-Orbit Checkout Study
1977
100 pages
Report