The project involves the following development: Land acquisition for clear zones and approach lighting system (easements); extend and light Runway 11/29 from 6,000' to 6,700'; strengthen Runway 11/29 (6,000' x 150'); construct and light partial parallel taxiway (3,600'); construct fire/crash building; glide slope grading. The purpose of this development is to upgrade the runway to DC-9 aircraft standards which are presently serving the airport, increase safety, and provide the necessary site preparation and land for the proposed Instrument and Visual Approach Landing Aids. There are no identifiable adverse environmental effects associated with improving Runway 11/29. (Author)
Muscle Shoals Airports, Muscle Shoals, Alabama
1971
23 pages
Report
No indication
English
Muscle Shoals Airport, Muscle Shoals, Alabama
NTIS | 1971
Hydro-electric development at the muscle shoals
Engineering Index Backfile | 1925
|SHOALS-1000 Airborne Lidar Bathymetry
Online Contents | 2003
Shoals of Capricorn-a multidisciplinary approach
British Library Online Contents | 1998
|Lightship no. 72 for the Diamond Shoals
Engineering Index Backfile | 1900