Information is given in viewgraph form on the Common Lunar Lander (CLL) engineering study results. The mission is to provide a delivery system to soft-land a 200 kg payload set at any given lunar latitude and longitude. Topics covered include the study schedule, mission goals and requirements, the CLL reference mission, costs, CLL options, and two stage performance analysis.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Common Lunar Lander (CLL) Engineering Study Results


    Contributors:

    Publication date :

    1991


    Size :

    16 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English





    Common lunar lander

    Bailey, S. / Stecklein, J. / Chen, H. et al. | NTRS | 1992


    Common lunar lander

    BAILEY, S. / STECKLEIN, J. / CHEN, H. et al. | AIAA | 1992