The project involves the removal of surcharge, installation of drainage and the paving, lighting and marking of an outer taxiway approximately 2,900 feet in length and 100 feet in width. The project will complete all but one final phase of a long term program to establish a dual taxiway system around the outer perimeter of the terminal complex from North to South Hangar Areas in accordance with the Airport Layout Plan. The proposed project will enhance environmental quality through reductions in overall noise produced by aircraft ground operations and will thereby act to improve ambient noise levels in the Jefferies Point section of East Boston as compared with operations on the existing taxiway system. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Massachusetts, Boston Airport Boston-Logan International Airport, Suffolk County


    Publication date :

    1971


    Size :

    36 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English






    Boston-Logan International Airport Generic Environmental Impact Reports and Airport Improvements

    Lurie, C. / American Society of Civil Engineers | British Library Conference Proceedings | 1998


    Departure Throughput Study for Boston Logan International Airport

    Simaiakis, Ioannis / Balakrishnan, Hasmsa | DSpace@MIT | 2011

    Free access

    Improving public transportation to Boston Logan International Airport

    Cao, Siyuan, M. Eng. Massachusetts Institute of Technology / O'Connor, Andrew / Were, Brenda | DSpace@MIT | 2013

    Free access