The study was partially funded by the U.S. Trade and Development Agency on behalf of Ilyushin Design Bureau, an aircraft manufacturer that was formerly part of the Russian military-industrial complex. The objective of the report is to assess the feasibility of two inter-related projects. The first would develop regional air transport services in Russia utilizing the Metro 23 aircraft, and the second involves producing the IL-103, a two-to-five seat single engine aircraft. This is the last of five volumes, and it includes materials from a Quality Assurance Briefing which was conducted from October 25-29, 1993.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Quality Assurance Briefing. Held on October 25-29, 1993


    Publication date :

    1993


    Size :

    164 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English