It is the consensus of the Design Review Team that the standby diesel generator should function as intended, and in doing so, should meet the needs of the (SNF) CVDF Project. The major comments received from the Design Review Team which require action are as follows: (1) the deletion of the requirement to heat trace the piping from the diesel storage tank to the diesel day tank and to heat the diesel storage tank; removing the requirement to heat trace the sprinkler piping in the process bays and (2) the relocation of the Diesel Generator Building away from the railroad tracks. The design drawings, DRD, and the FSAR will require revisions to incorporate these changes.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    SNF CVDF Standby Diesel Generator Formal Design Review Report


    Contributors:
    S. A. Brisbin (author) / G. Singh (author)

    Publication date :

    2002


    Size :

    8 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English






    Standby diesel generating sets in nuclear power stations

    Lohaus,K.J. / MTU Friedrichshafen | Automotive engineering | 1977



    METHOD AND APPARATUS FOR PRIORITIZING WARSHIP'S STANDBY GENERATOR

    PARK IN TAEK | European Patent Office | 2022

    Free access