All analyses and tradeoffs conducted to establish the MSS operations and crew activities are discussed. The missions and subsystem integrated analyses that were completed to assure compatibility of program elements and consistency with program objectives are presented. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Modular Space Station Phase B Extension Preliminary System Design. Volume 2 Operations and Crew Analyses


    Contributors:
    R. D. Meston (author) / M. R. Schall (author) / C. L. Brockman (author) / W. H. Bender (author)

    Publication date :

    1972


    Size :

    192 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English