This document serves as the final report on the construction and opening of the Roundabout Project in London, Kentucky (Kentucky Item Number 11?904.1). This project (hereafter referred to as the London Roundabout) was constructed on the authority of the Kentucky Transportation Cabinet (KYTC), which received an Accelerated Innovation Deployment (AID) Demonstration grant of $1 million to offset project construction costs. The AID Demonstration program requires that award recipients submit a final report to the Federal Highway Administration (FHWA) within six months of project completion. The purpose of this report is to document the project delivery and construction processes, benefits, and lessons learned, which includes development and/or refinement of guidance, specifications, or other tools and methods that could be used to adopt the roundabout innovation as standard practice.
Accelerated Innovation Deployment (AID) Demonstration: KYTC - Roundabout Installation Project in London, Kentucky
2017
46 pages
Report
No indication
English
Transportation & Traffic Planning , Regional Administration & Planning , Urban Administration & Planning , Transportation , Transportation Safety , Accelerated Innovation Deployment (AID) , Roundabout design , London(Kentucky) , Demonstration grants , Transportation planning , Installation design , Specifications , Standard practice , Guidance , Federal Highway Administration (FHWA) , Kentucky Transportation Cabinet (KYTC)
Yellow rhythms : a roundabout for London
TIBKAT | 2000
|Bracknell roundabout -- Construction of roundabout under railway
Engineering Index Backfile | 1956
|Roundabout system of traffic at certain London squares
Engineering Index Backfile | 1929
New Type of Roundabout: Roundabout with “Depressed” Lanes for Right Turning – “Flower Roundabout”
DOAJ | 2011
|