This document serves as the final report on the construction and opening of the Roundabout Project in London, Kentucky (Kentucky Item Number 11?904.1). This project (hereafter referred to as the London Roundabout) was constructed on the authority of the Kentucky Transportation Cabinet (KYTC), which received an Accelerated Innovation Deployment (AID) Demonstration grant of $1 million to offset project construction costs. The AID Demonstration program requires that award recipients submit a final report to the Federal Highway Administration (FHWA) within six months of project completion. The purpose of this report is to document the project delivery and construction processes, benefits, and lessons learned, which includes development and/or refinement of guidance, specifications, or other tools and methods that could be used to adopt the roundabout innovation as standard practice.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Accelerated Innovation Deployment (AID) Demonstration: KYTC - Roundabout Installation Project in London, Kentucky


    Contributors:
    J. Jasper (author) / A. Kirk (author)

    Publication date :

    2017


    Size :

    46 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English




    Yellow rhythms : a roundabout for London

    Weizman, Eyal | TIBKAT | 2000



    Bracknell roundabout -- Construction of roundabout under railway

    Kendal, J.T. / Palmer, R.W. | Engineering Index Backfile | 1956



    New Type of Roundabout: Roundabout with “Depressed” Lanes for Right Turning – “Flower Roundabout”

    Tomaž Tollazzi / Marko Renčelj / Sašo Turnšek | DOAJ | 2011

    Free access